HomeRegionsUnited KingdomNews & Case studiesDroskyn Point, Perranporth, Cornwall
Back to overviewCase study1 August 2021
Time to read: 2 min

Droskyn Point, Perranporth, Cornwall


Download:
case_study_-_droyskn_point-_perranporth.pdf

August 2021

Overview

Road construction. 

Construction

Incinerator Bottom Ash Aggregate (IBAA) was supplied from our Blue Phoenix Cornwall Plant at St Dennis. IBAA Type 1 subbase Granite Blend was laid at varying depths of between 150mm and 300mm and was then surfaced with asphalt.

Benefit

IBAA is an extremely cost-effective material when compared to Primary Aggregates and BP UK is working towards a verified Carbon Footprint. There are also advantages logistically when using IBAA due to the low density of the material allowing for fewer vehicle movements as this gives volumetric advantages over primary materials.

Sustainability

The extraction of primary aggregates for construction and transport to construction sites places enormous pressure on the environment. Mineral mining accounts for 2.8% of the global greenhouse gas emissions. The use of manufactured aggregates from IBA prevents landfilling, mining of virgin raw materials and contributes to the circular economy.

Read more